Skip to content
Success

Changes

Summary

  1. Tweaking introduction paragraph. (commit: ffe7c76) (details)
  2. Update the about page to match current state of things. (commit: 4a5869b) (details)
  3. Preparation for COMBINE (commit: 1b00807) (details)
  4. Preparation for COMBINE (commit: fbc84de) (details)
Commit ffe7c762da1025dae3ac4468ee19d95f59b758a1 by David Nickerson
Tweaking introduction paragraph.
(commit: ffe7c76)
The file was modifiedthemes/pj/templates/index.html (diff)
Commit 4a5869b42534170415536d9062228363dc1b1fc5 by David Nickerson
Update the about page to match current state of things.
(commit: 4a5869b)
The file was modifiedcontent/pages/about.md (diff)
Commit 1b00807c43d0b51afaa53cd531ea53a66a588fd9 by karlu264
Preparation for COMBINE
Added footer with contact information and changed the logo, button
colors and background.
(commit: 1b00807)
The file was modifiedthemes/pj/templates/base.html (diff)
The file was modifiedthemes/pj/templates/index.html (diff)
The file was modifiedcontent/pages/editorial-board.md (diff)
Commit fbc84deea65cc66b630750cd84322268d8963ca1 by karlu264
Preparation for COMBINE
Added footer with contact information and changed the logo, button
colors and background.
(commit: fbc84de)
The file was modifiedcontent/pages/editorial-board.md (diff)
The file was modifiedthemes/pj/templates/index.html (diff)
The file was modifiedthemes/pj/templates/base.html (diff)